wp_no=1018 wp_name=Tropospheric BrO algorithm development for Sentinel-5 list_of_product_IDs= wp_start=03/2017 wp_end=02/2022 wp_responsible=BIRA no_of_participants=2 BIRA 0 0 0.5 1 0.5 0 10000 DLR 0.0 0.0 0.2 0.4 0.4 0.0 15568 wp_objectives: The objective of this WP is the development of an operational S5 tropospheric BrO column product. wp_methodology: - (DLR) Tropospheric BrO algorithm adaptation to S5 (based on existing GOME-2 scheme) - (BIRA) Evaluation and testing of the tropospheric BrO column algorithm for S5 using synthetic S5 data - (DLR) UPAS implementation wp_datasources: - S5 level 1 product wp_deliverables: - Tropospheric BrO algorithms for S5 - ATBD for S5 tropospheric BrO product End